Ward Electric Company, Inc.

Location:

Julesburg, CO

Crook, CO

Peyton, CO

Somerset, NE

Walsenburg, NE

Weston, CO


Hastings, NE


Williams, AZ

Greely, CO


Hastings, NE

Ault, CO

Fleming, CO

Ensign, KS

Minco, OK


Chase, KS


Grand Island, NE


Mojave, CA


Clay Center, KS 


Carpenter, WY

Grover, CO


Kimball, NE

Holyoke, CO

Ord, NE


Omaha, NE

Customer:

Highline Electric

Highline Electric

Tri State

Oxbow Mining

San Isabel Electric

San Isabel Electric


Hastings Energy


Blattner Energy

WAPA


Hastings Utilities

WAPA

WAPA

Blattner Energy

Blattner Energy


Midwest Energy


Nebraska Public Power


Blattner Energy 


Kansas Power Pool


High West Energy

High West Energy


High West Energy

High Line Electric 

Nebraska Public Power


Omaha Public Power

Voltage:

115 KV / H-Frame 266 MCM (2 miles)

69 KV / Single Pole Steel & Wood 266 MCM (14 Miles)

115 KV / Single Pole Steel & Wood 795 MCM (16 Miles)

46 KV / Single Pole Wood 336 MCM (4.5 Miles)

115 KV / H-Frame 477 MCM Concrete poles (5.5 Miles)

115 KV / H-Frame 477 MCM 3 Pole, Single Pole (9.8 Miles)

115 KV Steel/ Single Pole T-2 -4/0 MCM, T-2-477 MCM (3.5 Miles)

138 KV Single Pole Wood 795 MCM (3.5 Miles)

115 KV/Laminated Poles,Substation Tie, 477 MCM, 1272 MCM, 2156 MCM

115 KV, H-Structure, Re-Conductor 954 MCM (4 Miles)

230 KV/Wood Pole, Substation Tie

115 KV Substation Tie Laminated Poles, 477 MCM

115 KV/Single Pole Wood, Laminated (19.5 Miles)

345 KV/ H Structure, 3 Pole Structures, 795 Bundle, (10 Miles)

115 KV, Single Wood, H-Structure, Steel, 795 MCM (6.5 Miles)

230 KV/ H-Structure Wood Pole Replacement and Re-Conductor 795 MCM SD

230 KV/Single Pole, Davit Arm, Direct Imbed and Foundations, Steel

115 KV, Re-route Through Town w/ Underbuilt, Steel Pole, Foundations, 266MCM (1.7 miles)

34.5 Single Wood Pole, T2-556 w/Underbuilt (28 miles)

34.5 Single Pole/ H-Structure, T2-556 w/ Underbuilt (25 miles)

34.5 Single Pole, T2-4Ø w/ Underbuilt (8 miles) 

69 KV / Single Pole w/ Underbuilt 266 MCM (6 miles)

115 KV / Total Re-Furbish, In Addition 16 Miles Change Out Existing Static to New 3/8” Static

230 KV / Change Out Lattice Structures, TO Single Mono Poles